{"id":6005,"date":"2022-02-24T09:25:26","date_gmt":"2022-02-24T08:25:26","guid":{"rendered":"https:\/\/www.cacbgi.cat\/?p=6005"},"modified":"2022-02-26T09:27:58","modified_gmt":"2022-02-26T08:27:58","slug":"el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses","status":"publish","type":"post","link":"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/","title":{"rendered":"El Consorci d\u2019Aig\u00fces Costa Brava Girona millora el sanejament i la gesti\u00f3 de les aig\u00fces residuals a Roses"},"content":{"rendered":"<p><strong>La retirada de residus s\u00f2lids s\u2019eliminar\u00e0 de l\u2019estaci\u00f3 de bombament central, situada al passeig Mar\u00edtim, i es traslladar\u00e0 a la depuradora per solucionar els problemes de mol\u00e8sties per als ve\u00efns<\/strong><\/p>\n<p><strong>Les actuacions, finan\u00e7ades per l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA), tenen un cost previst de 787.076 euros i estaran acabades abans de l\u2019estiu<\/strong><\/p>\n<p>El president de la Diputaci\u00f3 de Girona i del Consorci d\u2019Aig\u00fces Costa Brava Girona, Miquel Noguer, i l\u2019alcalde de Roses, Joan Plana, han presentat aquest mat\u00ed les actuacions que s\u2019estan portant a terme des del mes de novembre passat per millorar el sanejament i la gesti\u00f3 de les aig\u00fces residuals al municipi. A l\u2019acte, tamb\u00e9 hi han assistit la gerent de l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA), Mar Le\u00f3n; la primera tinenta d&#8217;alcaldia i regidora de Turisme, Montse Mindan, i el regidor d\u2019Infraestructures i Serveis P\u00fablics de Roses, Juan Manuel Fern\u00e1ndez.<\/p>\n<p>Les obres preveuen la remodelaci\u00f3 de l\u2019estaci\u00f3 de bombament (EBAR) central de Roses, situada al passeig Mar\u00edtim, espai on s\u2019ha fet la compareixen\u00e7a davant els mitjans, i tamb\u00e9 l\u2019ampliaci\u00f3 del pretractament de l\u2019estaci\u00f3 depuradora (EDAR). El prop\u00f2sit dels treballs \u00e9s traslladar la retirada de residus s\u00f2lids de la xarxa de sanejament des del bombament central fins a la depuradora. D\u2019aquesta manera, s\u2019acabaran els problemes de mol\u00e8sties i males olors per als ve\u00efns i usuaris de la zona, alhora que aix\u00f2 representar\u00e0 una adequaci\u00f3 i millora substancial del funcionament del sistema.<\/p>\n<p>Les actuacions tenen un cost previst de 787.076 euros sense IVA, i estan finan\u00e7ades per l\u2019ACA a trav\u00e9s d\u2019un conveni subscrit amb el Consorci d\u2019Aig\u00fces Costa Brava Girona. La previsi\u00f3 \u00e9s que estiguin enllestides abans d\u2019aquest estiu.<\/p>\n<p>El president de la Diputaci\u00f3 de Girona, Miquel Noguer, ha destacat la import\u00e0ncia i la necessitat d\u2019obres com aquesta: \u00abCom a ajuntament d\u2019ajuntaments que som, el nostre comprom\u00eds \u00e9s ser l\u2019eix vertebrador de les necessitats municipals. En aquest sentit, l\u2019aigua i el sanejament s\u00f3n serveis b\u00e0sics, que requereixen una gesti\u00f3 efica\u00e7 i precisa i, des del Consorci d\u2019Aig\u00fces, hem incidit molt en aquesta actuaci\u00f3, que repercutir\u00e0 en benefici no nom\u00e9s dels ciutadans de Roses, sin\u00f3 tamb\u00e9 de les persones que la visitin\u00bb.<\/p>\n<p>Per la seva part, l\u2019alcalde, Joan Plana, ha afegit: \u00abAquest \u00e9s un projecte llargament esperat a Roses, que esperem que posar\u00e0 fi als problemes de males olors i a les mol\u00e8sties que ocasionaven a ve\u00efns i vianants d\u2019aquest punt del passeig de la poblaci\u00f3, molt concorregut al llarg de tot l\u2019any. Ser\u00e0, per tant, una millora especialment agra\u00efda per part de la gent\u00bb.<\/p>\n<p><strong>Els treballs, al detall<\/strong><\/p>\n<p>A l\u2019estaci\u00f3 de bombament central de Roses, s\u2019hi instal\u00b7laran quatre noves bombes (dues a cada pou) amb capacitat per impulsar els s\u00f2lids fins a la depuradora. D\u2019aquesta manera, es podr\u00e0 retirar el tam\u00eds que ara hi ha instal\u00b7lat i aix\u00ed eliminar el punt de generaci\u00f3 de residus. En tot cas, es col\u00b7locar\u00e0 un nou tam\u00eds tipus Stormscreen en el pou del sobreeixidor per als episodis de pluja en qu\u00e8 les bombes d\u2019impulsi\u00f3 cap a l\u2019EDAR no tenen capacitat suficient.<\/p>\n<p>Tamb\u00e9 es canviar\u00e0 la configuraci\u00f3 del sistema de bombes per millorar-ne el funcionament. Actualment existeixen dos pous de bombament denominats <em>pou d\u2019estiu<\/em> i <em>pou d\u2019hivern<\/em>, com a conseq\u00fc\u00e8ncia de la variabilitat dels cabals per l\u2019estacionalitat de la zona. El pou d\u2019estiu passar\u00e0 a ser el principal i el d\u2019hivern, el de refor\u00e7, al rev\u00e9s que fins ara. En paral\u00b7lel, tamb\u00e9 s\u2019estan executant obres estructurals com una nova caldereria en acer inoxidable o la construcci\u00f3 de murs separadors de formig\u00f3 armat entre les bombes dels dos pous.<\/p>\n<p>Per la seva part, les obres a la depuradora se centraran a adequar-ne el pretractament a les noves condicions d\u2019\u00fas. En aquest sentit, i a banda de la renovaci\u00f3 d\u2019equips, est\u00e0 prevista la instal\u00b7laci\u00f3 de dos nous tamisos de neteja autom\u00e0tica amb un pas de malla de 6 mm. Els actuals s\u00f3n de 3 mm i es considera que l\u2019increment de residus s\u00f2lids que hi arribaran en suposaria una saturaci\u00f3 molt m\u00e9s r\u00e0pida i reduiria la capacitat del pretractament.<\/p>\n<p>El Consorci d\u2019Aig\u00fces Costa Brava Girona \u00e9s un ens p\u00fablic integrat per la Diputaci\u00f3 de Girona i quaranta-set municipis del litoral i el prelitoral giron\u00ed. Gestiona, dins del cicle de l\u2019aigua, el sanejament d\u2019aigua en alta (transport a l\u2019estaci\u00f3 depuradora d\u2019aig\u00fces residuals, depuraci\u00f3 i abocament al medi o regeneraci\u00f3) i l\u2019abastament d\u2019aigua en alta (captaci\u00f3, transport i potabilitzaci\u00f3) per subministrar-la a m\u00e9s d\u2019un mili\u00f3 de persones a l\u2019estiu, en col\u00b7laboraci\u00f3 amb l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua de la Generalitat de Catalunya (ACA).<\/p>","protected":false},"excerpt":{"rendered":"<p>La retirada de residus s\u00f2lids s\u2019eliminar\u00e0 de l\u2019estaci\u00f3 de bombament central, situada al passeig Mar\u00edtim, i es traslladar\u00e0 a la depuradora per solucionar els problemes de mol\u00e8sties per als ve\u00efns Les actuacions, finan\u00e7ades per l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA), tenen un cost previst de 787.076 euros i estaran acabades abans de l\u2019estiu El president de [&hellip;]<\/p>","protected":false},"author":2,"featured_media":6007,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[28,29,30,1],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v15.9.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>El Consorci d\u2019Aig\u00fces Costa Brava Girona millora el sanejament i la gesti\u00f3 de les aig\u00fces residuals a Roses - CACBGI<\/title>\n<link rel=\"canonical\" href=\"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"El Consorci d\u2019Aig\u00fces Costa Brava Girona millora el sanejament i la gesti\u00f3 de les aig\u00fces residuals a Roses - CACBGI\" \/>\n<meta property=\"og:description\" content=\"La retirada de residus s\u00f2lids s\u2019eliminar\u00e0 de l\u2019estaci\u00f3 de bombament central, situada al passeig Mar\u00edtim, i es traslladar\u00e0 a la depuradora per solucionar els problemes de mol\u00e8sties per als ve\u00efns Les actuacions, finan\u00e7ades per l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA), tenen un cost previst de 787.076 euros i estaran acabades abans de l\u2019estiu El president de [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/\" \/>\n<meta property=\"og:site_name\" content=\"CACBGI\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-24T08:25:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-02-26T08:27:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cacbgi.cat\/wp-content\/uploads\/2022\/02\/IMG_9516-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo de lectura\">\n\t<meta name=\"twitter:data1\" content=\"4 minutos\">\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cacbgi.cat\/#website\",\"url\":\"https:\/\/www.cacbgi.cat\/\",\"name\":\"CACBGI\",\"description\":\"Consorci d&#039;Aig\\u00fces Costa Brava, Girona\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/www.cacbgi.cat\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"es\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/#primaryimage\",\"inLanguage\":\"es\",\"url\":\"https:\/\/www.cacbgi.cat\/wp-content\/uploads\/2022\/02\/IMG_9516-scaled.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/#webpage\",\"url\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/\",\"name\":\"El Consorci d\\u2019Aig\\u00fces Costa Brava Girona millora el sanejament i la gesti\\u00f3 de les aig\\u00fces residuals a Roses - CACBGI\",\"isPartOf\":{\"@id\":\"https:\/\/www.cacbgi.cat\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/#primaryimage\"},\"datePublished\":\"2022-02-24T08:25:26+00:00\",\"dateModified\":\"2022-02-26T08:27:58+00:00\",\"author\":{\"@id\":\"https:\/\/www.cacbgi.cat\/#\/schema\/person\/a6fa16bd957f78f555960bfddebfc8a0\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/\",\"url\":\"https:\/\/www.cacbgi.cat\/\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"position\":2,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/\",\"url\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-millora-el-sanejament-i-la-gestio-de-les-aigues-residuals-a-roses\/\",\"name\":\"El Consorci d\\u2019Aig\\u00fces Costa Brava Girona millora el sanejament i la gesti\\u00f3 de les aig\\u00fces residuals a Roses\"}}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cacbgi.cat\/#\/schema\/person\/a6fa16bd957f78f555960bfddebfc8a0\",\"name\":\"premsa\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.cacbgi.cat\/#personlogo\",\"inLanguage\":\"es\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7e4303e9208064feace10571418cadd2?s=96&d=mm&r=g\",\"caption\":\"premsa\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","_links":{"self":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/6005"}],"collection":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/comments?post=6005"}],"version-history":[{"count":4,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/6005\/revisions"}],"predecessor-version":[{"id":6013,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/6005\/revisions\/6013"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/media\/6007"}],"wp:attachment":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/media?parent=6005"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/categories?post=6005"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/tags?post=6005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}