{"id":7217,"date":"2023-10-18T11:42:18","date_gmt":"2023-10-18T09:42:18","guid":{"rendered":"http:\/\/www.cacbgi.cat\/?p=7217"},"modified":"2023-10-18T11:43:55","modified_gmt":"2023-10-18T09:43:55","slug":"portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues","status":"publish","type":"post","link":"https:\/\/www.cacbgi.cat\/es\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/","title":{"rendered":"Portbou, Colera, el Port de la Selva i la Selva de Mar s\u2019adhereixen al servei d\u2019abastament d\u2019aigua en alta del Consorci d\u2019Aig\u00fces"},"content":{"rendered":"<p><strong>L\u2019ens supramunicipal ha assumit la titularitat de les instal\u00b7lacions necess\u00e0ries per desenvolupar el servei, d\u2019entre les quals destaca l\u2019embassament de Portbou<\/strong><\/p>\n<p><strong>Tamb\u00e9 s\u2019ha formalitzat l\u2019adjudicaci\u00f3 del nou contracte d\u2019abastament d\u2019aigua en alta repartit en dos lots i per un import total lleugerament superior als 16 milions d\u2019euros per als propers dos anys<\/strong><\/p>\n<p>Des d\u2019aquest mes d\u2019octubre, el Consorci d\u2019Aig\u00fces Costa Brava Girona gestiona l\u2019abastament d\u2019aigua potable en alta de Portbou, Colera, el Port de la Selva i la Selva del Mar (Alt Empord\u00e0). \u00c9s la culminaci\u00f3 d\u2019un proc\u00e9s engegat molts mesos enrere i amb el vistiplau dels mateixos municipis, que van donar-hi llum verda en els respectius plens.<\/p>\n<p>A partir d\u2019ara, doncs, el Consorci d\u2019Aig\u00fces incrementar\u00e0 entre un 10 % i un 15 % el volum d\u2019aigua lliurada a la zona nord, que el 2022 va ser de 5.281.747 m3. En el total de les tres zones (nord, centre i sud), va subministrar m\u00e9s de vint-i-dos milions de metres c\u00fabics (22.684.605 m3) l\u2019any passat.<\/p>\n<p>Fins ara, aquestes quatre poblacions de la Mar d\u2019Amunt, totes membres fundadors del Consorci d\u2019Aig\u00fces, nom\u00e9s en rebien el servei de sanejament en alta de les aig\u00fces residuals urbanes. L\u2019abastament en alta se\u2019l gestionaven elles mateixes.<\/p>\n<p>El trasp\u00e0s de compet\u00e8ncies tamb\u00e9 inclou el de la titularitat de les instal\u00b7lacions que es requereixen per desenvolupar aquest servei. La principal \u00e9s l\u2019embassament de Portbou, amb una capacitat de 130.000 m3, fins ara de titularitat municipal. Es tracta d\u2019una instal\u00b7laci\u00f3 que requereix millores i, en aquest sentit, est\u00e0 previst invertir-hi m\u00e9s de dos milions d\u2019euros en els propers anys, a trav\u00e9s de fons propis del Consorci d\u2019Aig\u00fces i ajuts de l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA).<\/p>\n<p>Ara mateix, ja s\u2019estan redactant els projectes de rehabilitaci\u00f3 dels desguassos de fons, d\u2019auscultaci\u00f3, de reparaci\u00f3 del cos de la presa i de les connexions del sistema d\u2019abastament en alta; actuacions que s\u2019aniran executant progressivament. Paral\u00b7lelament, el Consorci d\u2019Aig\u00fces ja ha contractat tamb\u00e9 la redacci\u00f3 del pla d\u2019autoprotecci\u00f3 i la revisi\u00f3 de seguretat de la presa.<\/p>\n<p>A Portbou, el tractament posterior de les aig\u00fces es porta a terme a l\u2019ETAP (estaci\u00f3 de tractament d\u2019aigua potable). Per completar l\u2019abastament en casos de sequera o d\u2019avaries de la xarxa, es compta amb un pou nou i una planta de tractament d\u2019osmosi inversa amb remineralitzaci\u00f3 posterior.<\/p>\n<p>A Colera, el subministrament d\u2019aigua potable es fa des d\u2019un pou al costat de la riera, des del qual es pot impulsar directament al dip\u00f2sit o, depenent de la qualitat de l\u2019aigua, a una planta de tractament mitjan\u00e7ant osmosi inversa.<\/p>\n<p>Per la seva part, el Port de la Selva efectua l\u2019abastament en alta des de dos pous de quinze metres de profunditat cadascun situats a la llera de la riera de Romanyac. Des d\u2019all\u00e0, l\u2019aigua s\u2019impulsa al dip\u00f2sit municipal ubicat al puig de les Forques, a la urbanitzaci\u00f3 el Mirador.<\/p>\n<p>La Selva de Mar disposa d\u2019una \u00fanica captaci\u00f3, formada per un pou situat als afores, davant l\u2019ermita de Sant Sebasti\u00e0, i que bomba aigua directament al dip\u00f2sit municipal.<\/p>\n<p>L\u2019adquisici\u00f3 de totes aquestes instal\u00b7lacions tamb\u00e9 ha motivat que el Consorci d\u2019Aig\u00fces Costa Brava Girona incrementi substancialment el seu pressupost per a l\u2019exercici 2024 per fer front als nous serveis que ofereix. Per primer cop, superar\u00e0 els cinquanta milions d\u2019euros (51,5 milions d\u2019euros), dels quals un 55 % corresponen a abastament, segons es va aprovar en el Ple de l\u2019ens aquest dimarts.<\/p>\n<p>\u00abLa nostra prioritat \u00e9s oferir un servei de m\u00e0xima solv\u00e8ncia i efici\u00e8ncia i creiem que aquests municipis de l\u2019Alt Empord\u00e0 sortiran beneficiats de la incorporaci\u00f3 al nostre servei d\u2019abastament en alta\u00bb, ha subratllat el president de la Diputaci\u00f3 de Girona i del Consorci d\u2019Aig\u00fces Costa Brava Girona, Miquel Noguer.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Nou contracte d\u2019abastament d\u2019aigua en alta<\/strong><\/p>\n<p>Coincidint amb aquesta adhesi\u00f3, el Consorci d\u2019Aig\u00fces tamb\u00e9 ha formalitzat el nou contracte del servei d\u2019explotaci\u00f3, conservaci\u00f3 i manteniment dels sistemes d\u2019abastament d\u2019aigua en alta (captaci\u00f3, transport, potabilitzaci\u00f3 i distribuci\u00f3).<\/p>\n<p>L\u2019adjudicaci\u00f3, que \u00e9s per als propers dos anys amb la possibilitat de pr\u00f2rroga, s\u2019ha repartit en dos lots, en funci\u00f3 de les zones d\u2019explotaci\u00f3 i de la ubicaci\u00f3 geogr\u00e0fica.<\/p>\n<p>El primer lot, per un import total de 9,6 milions d\u2019euros (sense IVA), ha recaigut en la UTE Transparenta Abastament Costa Brava, formada per l\u2019empresa Constructora de Calaf, SAU, i l\u2019empresa Sociedad de Fomento Agr\u00edcola Castellonense, SA (FACSA), cadascuna amb una participaci\u00f3 del 50 %. L\u2019adjudicat\u00e0ria s\u2019encarregar\u00e0 de la gesti\u00f3 de la zona nord (abastaments de la Mar d\u2019Amunt i de la xarxa d\u2019abastament de l\u2019ETAP d\u2019Empuriabrava) i sud (xarxa de l\u2019ETAP de Tossa de Mar \u2013 Lloret de Mar).<\/p>\n<p>El segon lot s\u2019ha adjudicat a la Companyia General d\u2019Aig\u00fces de Catalunya, SA, per un import total de 6,6 milions d\u2019euros (sense IVA). En el seu cas, gestionar\u00e0 la zona centre, que inclou el manteniment de l\u2019ETAP de Montfull\u00e0 (Bescan\u00f3), la xarxa de la Costa Brava centre i la xarxa de l\u2019antiga Mancomunitat de Palafrugell, Begur, Pals, Regenc\u00f3s i Torrent.<\/p>\n<p>El nou contracte continua incidint en l\u2019aspecte mediambiental i en la reducci\u00f3 de les emissions de CO2 dins del proc\u00e9s de descarbonitzaci\u00f3 dels seus serveis, en la l\u00ednia dels objectius de desenvolupament sostenible, els ODS. Tamb\u00e9 s\u2019ampliar\u00e0 la plantilla i es crear\u00e0 una estructura de funcionament per consolidar el servei i atendre els m\u00faltiples reptes que es plantegin en el futur.<\/p>\n<p>A m\u00e9s, aquest nou contracte tamb\u00e9 inclou disset actuacions de noves inversions addicionals a l\u2019explotaci\u00f3 ordin\u00e0ria. En s\u00f3n onze del primer lot, per 1,7 milions d\u2019euros, i sis m\u00e9s del segon lot, per 872.000 euros per als propers dos anys, fins al 2025.<\/p>","protected":false},"excerpt":{"rendered":"<p>L\u2019ens supramunicipal ha assumit la titularitat de les instal\u00b7lacions necess\u00e0ries per desenvolupar el servei, d\u2019entre les quals destaca l\u2019embassament de Portbou Tamb\u00e9 s\u2019ha formalitzat l\u2019adjudicaci\u00f3 del nou contracte d\u2019abastament d\u2019aigua en alta repartit en dos lots i per un import total lleugerament superior als 16 milions d\u2019euros per als propers dos anys Des d\u2019aquest mes [&hellip;]<\/p>","protected":false},"author":2,"featured_media":7223,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[28,29,30],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v15.9.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Portbou, Colera, el Port de la Selva i la Selva de Mar s\u2019adhereixen al servei d\u2019abastament d\u2019aigua en alta del Consorci d\u2019Aig\u00fces - CACBGI<\/title>\n<link rel=\"canonical\" href=\"https:\/\/www.cacbgi.cat\/es\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Portbou, Colera, el Port de la Selva i la Selva de Mar s\u2019adhereixen al servei d\u2019abastament d\u2019aigua en alta del Consorci d\u2019Aig\u00fces - CACBGI\" \/>\n<meta property=\"og:description\" content=\"L\u2019ens supramunicipal ha assumit la titularitat de les instal\u00b7lacions necess\u00e0ries per desenvolupar el servei, d\u2019entre les quals destaca l\u2019embassament de Portbou Tamb\u00e9 s\u2019ha formalitzat l\u2019adjudicaci\u00f3 del nou contracte d\u2019abastament d\u2019aigua en alta repartit en dos lots i per un import total lleugerament superior als 16 milions d\u2019euros per als propers dos anys Des d\u2019aquest mes [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cacbgi.cat\/es\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/\" \/>\n<meta property=\"og:site_name\" content=\"CACBGI\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-18T09:42:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-18T09:43:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cacbgi.cat\/wp-content\/uploads\/2023\/10\/Embassament_Portbou_panoramica-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo de lectura\">\n\t<meta name=\"twitter:data1\" content=\"5 minutos\">\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cacbgi.cat\/#website\",\"url\":\"https:\/\/www.cacbgi.cat\/\",\"name\":\"CACBGI\",\"description\":\"Consorci d&#039;Aig\\u00fces Costa Brava, Girona\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/www.cacbgi.cat\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"es\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.cacbgi.cat\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/#primaryimage\",\"inLanguage\":\"es\",\"url\":\"https:\/\/www.cacbgi.cat\/wp-content\/uploads\/2023\/10\/Embassament_Portbou_panoramica-1.jpg\",\"width\":800,\"height\":600},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/#webpage\",\"url\":\"https:\/\/www.cacbgi.cat\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/\",\"name\":\"Portbou, Colera, el Port de la Selva i la Selva de Mar s\\u2019adhereixen al servei d\\u2019abastament d\\u2019aigua en alta del Consorci d\\u2019Aig\\u00fces - CACBGI\",\"isPartOf\":{\"@id\":\"https:\/\/www.cacbgi.cat\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.cacbgi.cat\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/#primaryimage\"},\"datePublished\":\"2023-10-18T09:42:18+00:00\",\"dateModified\":\"2023-10-18T09:43:55+00:00\",\"author\":{\"@id\":\"https:\/\/www.cacbgi.cat\/#\/schema\/person\/a6fa16bd957f78f555960bfddebfc8a0\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.cacbgi.cat\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cacbgi.cat\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cacbgi.cat\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/\",\"url\":\"https:\/\/www.cacbgi.cat\/\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"position\":2,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/\",\"url\":\"https:\/\/www.cacbgi.cat\/portbou-colera-el-port-de-la-selva-i-la-selva-de-mar-sadhereixen-al-servei-dabastament-daigua-en-alta-del-consorci-daigues\/\",\"name\":\"Portbou, Colera, el Port de la Selva i la Selva de Mar s\\u2019adhereixen al servei d\\u2019abastament d\\u2019aigua en alta del Consorci d\\u2019Aig\\u00fces\"}}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cacbgi.cat\/#\/schema\/person\/a6fa16bd957f78f555960bfddebfc8a0\",\"name\":\"premsa\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.cacbgi.cat\/#personlogo\",\"inLanguage\":\"es\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7e4303e9208064feace10571418cadd2?s=96&d=mm&r=g\",\"caption\":\"premsa\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","_links":{"self":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/7217"}],"collection":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/comments?post=7217"}],"version-history":[{"count":3,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/7217\/revisions"}],"predecessor-version":[{"id":7224,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/7217\/revisions\/7224"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/media\/7223"}],"wp:attachment":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/media?parent=7217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/categories?post=7217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/tags?post=7217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}