{"id":7260,"date":"2023-11-16T10:07:04","date_gmt":"2023-11-16T09:07:04","guid":{"rendered":"http:\/\/www.cacbgi.cat\/?p=7260"},"modified":"2026-02-26T15:09:00","modified_gmt":"2026-02-26T14:09:00","slug":"el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala","status":"publish","type":"post","link":"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/","title":{"rendered":"El Consorci d\u2019Aig\u00fces Costa Brava Girona aprova el projecte de construcci\u00f3 d\u2019una estaci\u00f3 potabilitzadora a l\u2019Escala"},"content":{"rendered":"<p><strong>S\u2019ubicar\u00e0 en una parcel\u00b7la de 5.851 m2 dels terrenys de Mas Mart\u00ed, a l\u2019est del nucli urb\u00e0 del municipi alt-empordan\u00e8s<\/strong><\/p>\n<p><strong>Les obres tenen un termini d\u2019execuci\u00f3 de setze mesos i un pressupost de 7.316.647,50 euros, finan\u00e7ats amb recursos propis i un ajut de l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA)<\/strong><\/p>\n<p>Llum verda a la construcci\u00f3 d\u2019una estaci\u00f3 de tractament d\u2019aigua potable (ETAP) a l\u2019Escala. El Consorci d\u2019Aig\u00fces Costa Brava Girona ja ha aprovat inicialment el projecte constructiu del nou equipament, que ha de permetre garantir l\u2019abastament i la qualitat de l\u2019aigua al municipi alt-empordan\u00e8s.<\/p>\n<p>Les noves instal\u00b7lacions s\u2019ubicaran en una parcel\u00b7la de 5.851 m2 dels terrenys de Mas Mart\u00ed, a l\u2019est del nucli urb\u00e0, on ja hi ha els diferents pous de captaci\u00f3 d\u2019aigua de l\u2019aq\u00fc\u00edfer del Baix Ter. S\u2019hi accedeix a trav\u00e9s de la carretera GI-632 pel cam\u00ed de Niceto.<\/p>\n<p>Actualment, l\u2019Escala s\u2019abasteix mitjan\u00e7ant quatre pous actius i un cinqu\u00e8 en reserva. L\u2019aigua captada s\u2019impulsa a trav\u00e9s de canonades fins als dip\u00f2sits d\u2019emmagatzematge, on l\u2019aigua es tracta per ser distribu\u00efda. S\u00f3n dos dip\u00f2sits, que es troben a la zona del Pedr\u00f3 i al Puig Sec, a Montg\u00f3.<\/p>\n<p>La nova ETAP millorar\u00e0 la qualitat de l\u2019aigua, que en algun moment puntual ha ofert par\u00e0metres de ferro, mangan\u00e8s i clorurs. A m\u00e9s, comptar\u00e0 amb una capacitat de tractament inicial important, de 583 m3\/h, per\u00f2 amb la possibilitat d\u2019ampliar, en el futur, el cabal tractat fins als 875 m3\/h.<\/p>\n<p>El projecte, que entrar\u00e0 ara en fase de licitaci\u00f3 un cop tingui el vistiplau definitiu, t\u00e9 un pressupost d\u2019execuci\u00f3 per contracte de 7.316.647,50 euros (sense IVA). El Consorci d\u2019Aig\u00fces el finan\u00e7ar\u00e0 a trav\u00e9s de recursos propis i una subvenci\u00f3 concedida per l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA) d\u20191.943.600 euros, procedent de la l\u00ednia d\u2019ajuts per a inversions en actuacions d\u2019abastament en alta.<\/p>\n<p>El president de la Diputaci\u00f3 de Girona i del Consorci d\u2019Aig\u00fces Costa Brava Girona, Miquel Noguer, ha destacat: \u00abLa titularitat d\u2019\u00fas tant dels pous com dels terrenys passar\u00e0 a mans del Consorci d\u2019Aig\u00fces, que assumir\u00e0 la gesti\u00f3 de l\u2019aigua en alta de l\u2019Escala quan aquesta nova potabilitzadora entri en servei. Gr\u00e0cies a aquest nou equipament, l\u2019aigua passar\u00e0 per un tractament molt m\u00e9s exhaustiu, tal com recomana la normativa\u00bb.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Una obra rellevant<\/strong><\/p>\n<p>El projecte preveu un edifici principal amb estructura prefabricada que allotjar\u00e0 un decantador, una zona de treball amb possibilitat d\u2019acollir una futura nova l\u00ednia de filtraci\u00f3, filtres de sorra, dip\u00f2sits de recuperaci\u00f3, aigua de neteja i aigua tractada, la desinfecci\u00f3 UV, les sales de clor, quadres el\u00e8ctrics, un taller i un grup electrogen, la impulsi\u00f3 a dip\u00f2sits municipals, la zona de control, les sales de qu\u00edmics de l\u2019obra d\u2019arribada i de la deshidrataci\u00f3 de fangs i, finalment, els serveis auxiliars de la planta.<\/p>\n<p>D\u2019altra banda, el dip\u00f2sit espessidor de fangs, de planta rectangular, s\u2019ubicar\u00e0 prop de l\u2019obra d\u2019arribada i al costat de l\u2019edifici de deshidrataci\u00f3, que allotjar\u00e0 les bombes d\u2019alimentaci\u00f3 des de l\u2019espessidor i els equips de deshidrataci\u00f3 de fangs. L\u2019edifici de bufadors se situar\u00e0 a l\u2019extrem oest de la parcel\u00b7la.<\/p>\n<p>La l\u00ednia de tractament d\u2019aigua de la nova ETAP de l\u2019Escala inclour\u00e0 una oxidaci\u00f3 pr\u00e8via de l\u2019aigua amb permanganat pot\u00e0ssic, aeraci\u00f3, barreja r\u00e0pida amb coagulant, floculaci\u00f3, decantaci\u00f3, filtraci\u00f3, desinfecci\u00f3 amb raigs UV i, posteriorment, desinfecci\u00f3 amb clor. Tamb\u00e9 es construir\u00e0 un dip\u00f2sit per a aigua filtrada, que s\u2019utilitzar\u00e0 per rentar els filtres, i un dip\u00f2sit de recuperaci\u00f3 d\u2019aigua de rentat.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Sostenibilidad<\/strong><\/p>\n<p>L\u2019alimentaci\u00f3 el\u00e8ctrica de la potabilitzadora s\u2019efectuar\u00e0 a trav\u00e9s d\u2019un nou centre de transformaci\u00f3 de mitjana tensi\u00f3 de 25 kV, ubicat en una caseta dins la mateixa parcel\u00b7la. Alimentar\u00e0 el quadre general de baixa tensi\u00f3, situat a l\u2019edifici de filtres, dip\u00f2sits i desinfecci\u00f3, a partir del qual s\u2019alimentaran la resta de subquadres el\u00e8ctrics.<\/p>\n<p>En aquest sentit, hi haur\u00e0 una instal\u00b7laci\u00f3 generadora assistida en qu\u00e8 la font de subministrament preferent \u00e9s la xarxa de distribuci\u00f3 p\u00fablica. D\u2019aquesta manera, s\u2019instal\u00b7lar\u00e0 un grup electrogen que entrar\u00e0 en funcionament de manera autom\u00e0tica quan detecti un zero de tensi\u00f3 per part de la companyia el\u00e8ctrica.<\/p>\n<p>En l\u00ednia amb la vocaci\u00f3 de reduir les emissions de CO2 i apostar per la sostenibilitat, el Consorci d\u2019Aig\u00fces ha previst una instal\u00b7laci\u00f3 d\u2019energia solar fotovoltaica que permeti nodrir la mateixa instal\u00b7laci\u00f3. Aix\u00ed, es col\u00b7locaran plaques solars a la coberta de l\u2019edifici principal de l\u2019ETAP.<\/p>\n<p>L\u2019automatitzaci\u00f3 i el control de la planta es faran a partir de diferents controladors l\u00f2gics programables (PLC) situats al costat dels quadres el\u00e8ctrics dels diferents edificis que integren l\u2019equipament.<\/p>\n<p>Es calcula que el termini d\u2019execuci\u00f3 de les obres, que es distribuir\u00e0 en diferents fases \u2013les primeres seran els treballs previs i l\u2019obra d\u2019arribada i de l\u2019edifici principal\u2013, sigui aproximadament d\u2019uns setze mesos.<\/p>","protected":false},"excerpt":{"rendered":"<p>S\u2019ubicar\u00e0 en una parcel\u00b7la de 5.851 m2 dels terrenys de Mas Mart\u00ed, a l\u2019est del nucli urb\u00e0 del municipi alt-empordan\u00e8s Les obres tenen un termini d\u2019execuci\u00f3 de setze mesos i un pressupost de 7.316.647,50 euros, finan\u00e7ats amb recursos propis i un ajut de l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA) Llum verda a la construcci\u00f3 d\u2019una estaci\u00f3 [&hellip;]<\/p>","protected":false},"author":2,"featured_media":7262,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[28,29,30],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v15.9.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>El Consorci d\u2019Aig\u00fces Costa Brava Girona aprova el projecte de construcci\u00f3 d\u2019una estaci\u00f3 potabilitzadora a l\u2019Escala - CACBGI<\/title>\n<link rel=\"canonical\" href=\"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"El Consorci d\u2019Aig\u00fces Costa Brava Girona aprova el projecte de construcci\u00f3 d\u2019una estaci\u00f3 potabilitzadora a l\u2019Escala - CACBGI\" \/>\n<meta property=\"og:description\" content=\"S\u2019ubicar\u00e0 en una parcel\u00b7la de 5.851 m2 dels terrenys de Mas Mart\u00ed, a l\u2019est del nucli urb\u00e0 del municipi alt-empordan\u00e8s Les obres tenen un termini d\u2019execuci\u00f3 de setze mesos i un pressupost de 7.316.647,50 euros, finan\u00e7ats amb recursos propis i un ajut de l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA) Llum verda a la construcci\u00f3 d\u2019una estaci\u00f3 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/\" \/>\n<meta property=\"og:site_name\" content=\"CACBGI\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-16T09:07:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-26T14:09:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cacbgi.cat\/wp-content\/uploads\/2023\/11\/Terreny_ETAP.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo de lectura\">\n\t<meta name=\"twitter:data1\" content=\"4 minutos\">\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cacbgi.cat\/#website\",\"url\":\"https:\/\/www.cacbgi.cat\/\",\"name\":\"CACBGI\",\"description\":\"Consorci d&#039;Aig\\u00fces Costa Brava, Girona\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/www.cacbgi.cat\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"es\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/#primaryimage\",\"inLanguage\":\"es\",\"url\":\"https:\/\/www.cacbgi.cat\/wp-content\/uploads\/2023\/11\/Terreny_ETAP.jpg\",\"width\":800,\"height\":600},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/#webpage\",\"url\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/\",\"name\":\"El Consorci d\\u2019Aig\\u00fces Costa Brava Girona aprova el projecte de construcci\\u00f3 d\\u2019una estaci\\u00f3 potabilitzadora a l\\u2019Escala - CACBGI\",\"isPartOf\":{\"@id\":\"https:\/\/www.cacbgi.cat\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/#primaryimage\"},\"datePublished\":\"2023-11-16T09:07:04+00:00\",\"dateModified\":\"2026-02-26T14:09:00+00:00\",\"author\":{\"@id\":\"https:\/\/www.cacbgi.cat\/#\/schema\/person\/a6fa16bd957f78f555960bfddebfc8a0\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/\",\"url\":\"https:\/\/www.cacbgi.cat\/\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"position\":2,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/\",\"url\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-costa-brava-girona-aprova-el-projecte-de-construccio-duna-estacio-potabilitzadora-a-lescala\/\",\"name\":\"El Consorci d\\u2019Aig\\u00fces Costa Brava Girona aprova el projecte de construcci\\u00f3 d\\u2019una estaci\\u00f3 potabilitzadora a l\\u2019Escala\"}}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cacbgi.cat\/#\/schema\/person\/a6fa16bd957f78f555960bfddebfc8a0\",\"name\":\"premsa\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.cacbgi.cat\/#personlogo\",\"inLanguage\":\"es\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7e4303e9208064feace10571418cadd2?s=96&d=mm&r=g\",\"caption\":\"premsa\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","_links":{"self":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/7260"}],"collection":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/comments?post=7260"}],"version-history":[{"count":3,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/7260\/revisions"}],"predecessor-version":[{"id":8819,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/7260\/revisions\/8819"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/media\/7262"}],"wp:attachment":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/media?parent=7260"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/categories?post=7260"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/tags?post=7260"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}