{"id":8527,"date":"2025-08-26T14:06:11","date_gmt":"2025-08-26T12:06:11","guid":{"rendered":"https:\/\/www.cacbgi.cat\/?p=8527"},"modified":"2025-11-11T10:49:45","modified_gmt":"2025-11-11T09:49:45","slug":"el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou","status":"publish","type":"post","link":"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/","title":{"rendered":"El Consorci d\u2019Aig\u00fces inverteix dos milions d\u2019euros per construir una nova potabilitzadora i renovar la planta d\u2019osmosi a Portbou"},"content":{"rendered":"<p><strong>Les noves instal\u00b7lacions, m\u00e9s modernes i avan\u00e7ades tecnol\u00f2gicament, garantiran l\u2019abastament d\u2019aigua al municipi alt-empordan\u00e8s<\/strong><\/p>\n<p><strong>A partir d\u2019ara, tamb\u00e9 es podr\u00e0 potabilitzar l\u2019aigua de l\u2019embassament d\u2019acord amb els est\u00e0ndards de qualitat de la normativa actual<\/strong><\/p>\n<p>El president de la Diputaci\u00f3 de Girona i del Consorci d\u2019Aig\u00fces Costa Brava Girona, Miquel Noguer, i l\u2019alcalde de Portbou, Gael Rodr\u00edguez, han presentat aquest dimarts al mat\u00ed les actuacions que s\u2019estan ultimant al municipi per tenir garanties plenes d\u2019abastament d\u2019aigua en situacions futures d\u2019emerg\u00e8ncia.<\/p>\n<p>L\u2019acte ha tingut lloc a la nova estaci\u00f3 de tractament d\u2019aigua potable (ETAP), que s\u2019ha reconstru\u00eft completament. El nou equipament, m\u00e9s modern i avan\u00e7at tecnol\u00f2gicament, s\u2019ha dotat d\u2019un sistema de tractament per potabilitzar l\u2019aigua de l\u2019embassament de Portbou d\u2019acord amb els est\u00e0ndards de qualitat de la normativa actual. El seu cabal de disseny \u00e9s de 25 m<sup>3<\/sup>\/h.<\/p>\n<p>En paral\u00b7lel, s\u2019ha adequat el cam\u00ed d\u2019acc\u00e9s a l\u2019ETAP per al transport dels equips i materials, i per dur a terme totes les connexions el\u00e8ctriques i hidr\u00e0uliques necess\u00e0ries perqu\u00e8 funcioni completament.<\/p>\n<p>A aquesta obra, s\u2019hi ha sumat la renovaci\u00f3 de la planta d\u2019osmosi, situada m\u00e9s a prop del centre urb\u00e0, al mateix lloc on hi havia l\u2019antiga. Permetr\u00e0 tractar aigua del pou de Portbou a fi d\u2019adequar-la a les condicions de salinitat actuals, superiors a les del disseny original, de l\u2019any 2009. Aquesta instal\u00b7laci\u00f3 tindr\u00e0 capacitat per cobrir la demanda en situacions d\u2019impossibilitat eventual de potabilitzar aigua de l\u2019embassament, en situacions de sequera o en cas d\u2019avaries de la xarxa.<\/p>\n<p>El cost total d\u2019aquestes actuacions ha estat d\u20191.996.872,72 euros (sense IVA) i ha anat tot a c\u00e0rrec del Consorci d\u2019Aig\u00fces Costa Brava Girona. Es van iniciar per via d\u2019emerg\u00e8ncia l\u2019estiu passat, quan Catalunya travessava la pitjor sequera coneguda i hi havia la possibilitat que aquesta sequera es prolongu\u00e9s per quart any consecutiu.<\/p>\n<p>Si b\u00e9 l\u2019escenari actual ha canviat totalment amb les pluges d\u2019aquest 2025 \u2013Darnius-Boadella es troba ara per sobre del 60\u2009%\u2013, tant el president, Miquel Noguer, com l\u2019alcalde, Gael Rodr\u00edguez, consideren que aquestes actuacions eren \u00abimprescindibles per al municipi i han perm\u00e8s estar m\u00e9s preparats per a la propera sequera\u00bb.<\/p>\n<p>Miquel Noguer ha destacat: \u00abPortbou \u00e9s un municipi consorciat de fa m\u00e9s de cinquanta anys que disposava d\u2019una singularitat: tenir un embassament propi, de classe A. Per\u00f2 no el podia ni gestionar ni posar al dia, alhora que una tenia una ETAP i una planta d\u2019osmosi superades per unes condicions que es van agreujar notablement durant la sequera. Hi hav\u00edem d\u2019actuar perqu\u00e8 el municipi mereix una aigua i uns serveis de qualitat\u00bb.<\/p>\n<p>\u00abPortbou avui est\u00e0 un pas m\u00e9s a prop de disposar dels serveis p\u00fablics que mereix. Aquestes inversions realitzades pel Consorci d\u2019Aig\u00fces, afegides a les inversions de 723.000\u2009euros que l\u2019Ajuntament est\u00e0 duent a terme a la xarxa d\u2019aigua en baixa, simbolitzen el comprom\u00eds de les dues institucions locals amb uns serveis dignes per a la ciutadania aix\u00ed com l\u2019\u00e8xit de la col\u00b7laboraci\u00f3 entre diferents administracions\u00bb, ha afegit Gael Rodr\u00edguez.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>L\u2019abastament a la Mar d\u2019Amunt<\/strong><\/p>\n<p>Des que va assumir el servei d\u2019abastament d\u2019aigua en alta de Portbou, Colera, el Port de la Selva i la Selva de Mar l\u2019octubre del 2023, el Consorci d\u2019Aig\u00fces Costa Brava Girona ha invertit recursos per posar al dia totes les instal\u00b7lacions rebudes a la zona de la Mar d\u2019Amunt, fins llavors de titularitat municipal.<\/p>\n<p>En el cas concret de Portbou, hi ha la particularitat que el municipi no est\u00e0 connectat a la xarxa d\u2019abastament en alta de la Costa Brava nord, de manera que dep\u00e8n \u00fanicament dels recursos disponibles de la seva conca.<\/p>\n<p>Aix\u00ed doncs, la manca de pluges dels \u00faltims anys va comportar una situaci\u00f3 l\u00edmit l\u2019estiu del 2024: reserves minses a l\u2019embassament i una aigua de qualitat poc adient per a l\u2019abastament; una ETAP obsoleta, sense capacitat per tractar-la adequadament, i una salinitat del pou m\u00e9s alta de la que podia cobrir la planta d\u2019osmosi constru\u00efda el 2009 per l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA).<\/p>\n<p>Com a primera mesura, i mentre es redactaven i s\u2019executaven els projectes de renovaci\u00f3 de la potabilitzadora i de la nova planta d\u2019osmosi, es va llogar temporalment una planta d\u2019osmosi m\u00f2bil. Aquesta soluci\u00f3 transit\u00f2ria ha perm\u00e8s, durant l\u2019\u00faltim any, que el municipi dispos\u00e9s d\u2019aigua potable, en quantitat i qualitat. Aquesta instal\u00b7laci\u00f3 es retirar\u00e0 un cop les noves instal\u00b7lacions estiguin a ple rendiment, d\u2019aqu\u00ed a unes setmanes.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>L\u2019embassament, la seg\u00fcent fase<\/strong><\/p>\n<p>Un cop executades les actuacions per garantir l\u2019abastament d\u2019aigua a Portbou, el Consorci d\u2019Aig\u00fces Costa Brava Girona focalitzar\u00e0 els esfor\u00e7os en actuar a l\u2019embassament, tamb\u00e9 de la seva titularitat des de l\u2019octubre del 2023.<\/p>\n<p>Es tracta d\u2019una infraestructura amb capacitat de 100.000 m<sup>3<\/sup>. Inaugurat el 1974, fa cinquanta-un anys, requereix unes actuacions de manteniment i seguretat que l\u2019Ajuntament, l\u2019antic titular, no podia assumir. En aquest sentit, el Consorci d\u2019Aig\u00fces t\u00e9 previst destinar-hi dos milions d\u2019euros, de fons propis i a trav\u00e9s d\u2019ajuts de l\u2019ACA.<\/p>\n<p>En aquest sentit, s\u2019est\u00e0 treballant en els projectes de rehabilitaci\u00f3 dels desguassos del fons de la presa, i en el d\u2019ampliaci\u00f3 i millora del sistema d\u2019auscultaci\u00f3 i reparaci\u00f3 del cos de la instal\u00b7laci\u00f3 per evitar fuites. A banda d\u2019aix\u00f2, s\u2019han enllestit unes normes d\u2019explotaci\u00f3 i un pla d\u2019autoprotecci\u00f3 i s\u2019ha instal\u00b7lat tota una s\u00e8rie d\u2019equips de protecci\u00f3 de la poblaci\u00f3 en situacions d\u2019emerg\u00e8ncia, entre els quals cal esmentar quatre sirenes d\u2019av\u00eds, sistemes automatitzats de monitoratge de l\u2019estat de la presa i sistemes redundants de subministrament el\u00e8ctric i de connexi\u00f3 a la xarxa d\u2019internet.<\/p>","protected":false},"excerpt":{"rendered":"<p>Les noves instal\u00b7lacions, m\u00e9s modernes i avan\u00e7ades tecnol\u00f2gicament, garantiran l\u2019abastament d\u2019aigua al municipi alt-empordan\u00e8s A partir d\u2019ara, tamb\u00e9 es podr\u00e0 potabilitzar l\u2019aigua de l\u2019embassament d\u2019acord amb els est\u00e0ndards de qualitat de la normativa actual El president de la Diputaci\u00f3 de Girona i del Consorci d\u2019Aig\u00fces Costa Brava Girona, Miquel Noguer, i l\u2019alcalde de Portbou, Gael [&hellip;]<\/p>","protected":false},"author":2,"featured_media":8528,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[28,29,30],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v15.9.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>El Consorci d\u2019Aig\u00fces inverteix dos milions d\u2019euros per construir una nova potabilitzadora i renovar la planta d\u2019osmosi a Portbou - CACBGI<\/title>\n<link rel=\"canonical\" href=\"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"El Consorci d\u2019Aig\u00fces inverteix dos milions d\u2019euros per construir una nova potabilitzadora i renovar la planta d\u2019osmosi a Portbou - CACBGI\" \/>\n<meta property=\"og:description\" content=\"Les noves instal\u00b7lacions, m\u00e9s modernes i avan\u00e7ades tecnol\u00f2gicament, garantiran l\u2019abastament d\u2019aigua al municipi alt-empordan\u00e8s A partir d\u2019ara, tamb\u00e9 es podr\u00e0 potabilitzar l\u2019aigua de l\u2019embassament d\u2019acord amb els est\u00e0ndards de qualitat de la normativa actual El president de la Diputaci\u00f3 de Girona i del Consorci d\u2019Aig\u00fces Costa Brava Girona, Miquel Noguer, i l\u2019alcalde de Portbou, Gael [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/\" \/>\n<meta property=\"og:site_name\" content=\"CACBGI\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-26T12:06:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-11T09:49:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cacbgi.cat\/wp-content\/uploads\/2025\/08\/grup-ETAP-Portbou.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1616\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo de lectura\">\n\t<meta name=\"twitter:data1\" content=\"4 minutos\">\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cacbgi.cat\/#website\",\"url\":\"https:\/\/www.cacbgi.cat\/\",\"name\":\"CACBGI\",\"description\":\"Consorci d&#039;Aig\\u00fces Costa Brava, Girona\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/www.cacbgi.cat\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"es\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/#primaryimage\",\"inLanguage\":\"es\",\"url\":\"https:\/\/www.cacbgi.cat\/wp-content\/uploads\/2025\/08\/grup-ETAP-Portbou.jpg\",\"width\":1616,\"height\":1080},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/#webpage\",\"url\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/\",\"name\":\"El Consorci d\\u2019Aig\\u00fces inverteix dos milions d\\u2019euros per construir una nova potabilitzadora i renovar la planta d\\u2019osmosi a Portbou - CACBGI\",\"isPartOf\":{\"@id\":\"https:\/\/www.cacbgi.cat\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/#primaryimage\"},\"datePublished\":\"2025-08-26T12:06:11+00:00\",\"dateModified\":\"2025-11-11T09:49:45+00:00\",\"author\":{\"@id\":\"https:\/\/www.cacbgi.cat\/#\/schema\/person\/a6fa16bd957f78f555960bfddebfc8a0\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/\",\"url\":\"https:\/\/www.cacbgi.cat\/\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"position\":2,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/\",\"url\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-inverteix-dos-milions-deuros-per-renovar-la-potabilitzadora-i-construir-una-nova-planta-dosmosi-a-portbou\/\",\"name\":\"El Consorci d\\u2019Aig\\u00fces inverteix dos milions d\\u2019euros per construir una nova potabilitzadora i renovar la planta d\\u2019osmosi a Portbou\"}}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cacbgi.cat\/#\/schema\/person\/a6fa16bd957f78f555960bfddebfc8a0\",\"name\":\"premsa\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.cacbgi.cat\/#personlogo\",\"inLanguage\":\"es\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7e4303e9208064feace10571418cadd2?s=96&d=mm&r=g\",\"caption\":\"premsa\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","_links":{"self":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/8527"}],"collection":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/comments?post=8527"}],"version-history":[{"count":4,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/8527\/revisions"}],"predecessor-version":[{"id":8553,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/8527\/revisions\/8553"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/media\/8528"}],"wp:attachment":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/media?parent=8527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/categories?post=8527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/tags?post=8527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}