{"id":8675,"date":"2025-11-26T11:23:32","date_gmt":"2025-11-26T10:23:32","guid":{"rendered":"https:\/\/www.cacbgi.cat\/?p=8675"},"modified":"2025-11-26T11:23:32","modified_gmt":"2025-11-26T10:23:32","slug":"el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord","status":"publish","type":"post","link":"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/","title":{"rendered":"El Consorci d\u2019Aig\u00fces millora la fiabilitat de les infraestructures de captaci\u00f3 i transport d\u2019aigua a la Costa Brava nord"},"content":{"rendered":"<p><strong>S\u2019han invertit gaireb\u00e9 3,5 milions d\u2019euros per renovar el bombament del rec del Mol\u00ed (Castell\u00f3 d\u2019Emp\u00faries), substituir un tram de canonada de captaci\u00f3 de Vilanova de la Muga i augmentar la capacitat de transport d\u2019aigua a Llan\u00e7\u00e0 i Cadaqu\u00e9s<\/strong><\/p>\n<p><strong>Amb aquestes actuacions, es millora la garantia d\u2019abastament de la zona abastida des de la potabilitzadora d\u2019Empuriabrava<\/strong><\/p>\n<p>El Consorci d\u2019Aig\u00fces Costa Brava Girona ha completat aquest mes diverses actuacions estrat\u00e8giques orientades a refor\u00e7ar la fiabilitat del sistema d\u2019abastament d\u2019aigua a la zona de la Costa Brava nord. En total, s\u2019han invertit 3.346.795,90 euros (IVA incl\u00f2s), majorit\u00e0riament amb fons propis i amb una subvenci\u00f3 de l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA), per modernitzar infraestructures clau de captaci\u00f3 i transport.<\/p>\n<p>Les obres han incl\u00f2s la renovaci\u00f3 del bombament del rec del Mol\u00ed, a Castell\u00f3 d\u2019Emp\u00faries; la substituci\u00f3 d\u2019un tram de la canonada que connecta la captaci\u00f3 de Vilanova de la Muga (Peralada) amb l\u2019estaci\u00f3 de tractament d\u2019aigua potable (ETAP) d\u2019Empuriabrava, on hist\u00f2ricament s\u2019havien concentrat la major part d\u2019avaries, i la connexi\u00f3 del ramal de distribuci\u00f3 de Llan\u00e7\u00e0 a la canonada en alta de Roses.<\/p>\n<p>L\u2019estaci\u00f3 de bombament del rec del Mol\u00ed, situada a prop del nucli hist\u00f2ric de Castell\u00f3 d\u2019Emp\u00faries, era la captaci\u00f3 original de l\u2019ETAP d\u2019Empuriabrava quan va ser constru\u00efda l\u2019any 1987. Amb la construcci\u00f3 de la captaci\u00f3 i del dip\u00f2sit de Vilanova de la Muga l\u2019any 1994, l\u2019estaci\u00f3 de bombament va passar a tenir les funcions de captaci\u00f3 de reserva.<\/p>\n<p>L\u2019actuaci\u00f3 que s\u2019ha portat a terme ara ha perm\u00e8s substituir les bombes existents per equips amb millor efici\u00e8ncia energ\u00e8tica i s\u2019ha renovat la instal\u00b7laci\u00f3 el\u00e8ctrica per adequar-la a les normes actuals d\u2019aquest tipus d\u2019instal\u00b7lacions. L\u2019import final d\u2019aquesta actuaci\u00f3 ha estat de 183.027,18 euros, IVA incl\u00f2s.<\/p>\n<p>Per la seva part, la canonada que connecta el dip\u00f2sit de la captaci\u00f3 de Vilanova de la Muga i la potabilitzadora d\u2019Empuriabrava \u00e9s una infraestructura essencial del sistema d\u2019abastament de la Costa Brava nord. Instal\u00b7lada el 1994, t\u00e9 un di\u00e0metre de 900 mil\u00b7l\u00edmetres, \u00e9s feta de poli\u00e8ster refor\u00e7at amb fibra de vidre i ha prestat servei de manera fiable durant m\u00e9s de trenta anys. No obstant aix\u00f2, es va observar que al llarg d\u2019aquest per\u00edode la majoria de les avaries i fuites es concentraven en un tram proper al paratge de Sant Joan ses Closes, fet que indicava un comportament diferent dels materials en aquest tram.<\/p>\n<p>Atesos els riscos elevats que representava per al servei la possibilitat de tenir noves avaries en la captaci\u00f3 principal, s\u2019ha executat la substituci\u00f3 d\u2019un tram de canonada de 800 metres de longitud a fi de millorar la fiabilitat del funcionament de la canonada i la garantia del servei. L\u2019import final d\u2019aquesta actuaci\u00f3 ha estat d\u20191.227.831,90 euros i ha estat l\u2019\u00fanica de les tres que no ha estat finan\u00e7ada exclusivament pel Consorci d\u2019Aig\u00fces. En aquest cas, rebr\u00e0 una subvenci\u00f3 de l\u2019ACA d\u2019aproximadament un mili\u00f3 d\u2019euros.<\/p>\n<p>D\u2019altra banda, el ramal de distribuci\u00f3 d\u2019aigua en alta a Llan\u00e7\u00e0 ha estat connectat hist\u00f2ricament a la canonada en alta de Cadaqu\u00e9s, la qual cosa ha comportat limitacions de cabal en \u00e8poca punta que han afectat ambd\u00f3s municipis. L\u2019obra recentment finalitzada permetr\u00e0 alimentar el ramal de Llan\u00e7\u00e0 des de la canonada de transport d\u2019aigua a Roses, de dimensions superiors, de manera que aquest municipi i aquells que reben aigua en alta a trav\u00e9s de les seves instal\u00b7lacions, com s\u00f3n Colera, el Port de la Selva i la Selva de Mar, disposaran d\u2019un subministrament de m\u00e9s fiabilitat.<\/p>\n<p>A tot aix\u00f2, el canvi de font de prove\u00efment de Llan\u00e7\u00e0 alliberar\u00e0 volums del ramal de Cadaqu\u00e9s, que, en cas de necessitat, podran ser transportats fins al Port de la Selva i la Selva de Mar. L\u2019import final d\u2019aquesta actuaci\u00f3 ha estat d\u20191.935.936,85 euros, amb IVA.<\/p>\n<p>Amb aquestes millores, el Consorci d&#8217;Aig\u00fces refor\u00e7a la garantia d\u2019abastament a tota la zona subministrada a trav\u00e9s de la potabilitzadora d\u2019Empuriabrava i assegura un servei m\u00e9s eficient i adaptat a les necessitats actuals i futures del territori.<\/p>","protected":false},"excerpt":{"rendered":"<p>S\u2019han invertit gaireb\u00e9 3,5 milions d\u2019euros per renovar el bombament del rec del Mol\u00ed (Castell\u00f3 d\u2019Emp\u00faries), substituir un tram de canonada de captaci\u00f3 de Vilanova de la Muga i augmentar la capacitat de transport d\u2019aigua a Llan\u00e7\u00e0 i Cadaqu\u00e9s Amb aquestes actuacions, es millora la garantia d\u2019abastament de la zona abastida des de la potabilitzadora [&hellip;]<\/p>","protected":false},"author":2,"featured_media":8679,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[28,29,30],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v15.9.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>El Consorci d\u2019Aig\u00fces millora la fiabilitat de les infraestructures de captaci\u00f3 i transport d\u2019aigua a la Costa Brava nord - CACBGI<\/title>\n<link rel=\"canonical\" href=\"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"El Consorci d\u2019Aig\u00fces millora la fiabilitat de les infraestructures de captaci\u00f3 i transport d\u2019aigua a la Costa Brava nord - CACBGI\" \/>\n<meta property=\"og:description\" content=\"S\u2019han invertit gaireb\u00e9 3,5 milions d\u2019euros per renovar el bombament del rec del Mol\u00ed (Castell\u00f3 d\u2019Emp\u00faries), substituir un tram de canonada de captaci\u00f3 de Vilanova de la Muga i augmentar la capacitat de transport d\u2019aigua a Llan\u00e7\u00e0 i Cadaqu\u00e9s Amb aquestes actuacions, es millora la garantia d\u2019abastament de la zona abastida des de la potabilitzadora [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cacbgi.cat\/es\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/\" \/>\n<meta property=\"og:site_name\" content=\"CACBGI\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-26T10:23:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.cacbgi.cat\/wp-content\/uploads\/2025\/11\/Obra_VilanovaMuga.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1500\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo de lectura\">\n\t<meta name=\"twitter:data1\" content=\"3 minutos\">\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cacbgi.cat\/#website\",\"url\":\"https:\/\/www.cacbgi.cat\/\",\"name\":\"CACBGI\",\"description\":\"Consorci d&#039;Aig\\u00fces Costa Brava, Girona\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/www.cacbgi.cat\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"es\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/#primaryimage\",\"inLanguage\":\"es\",\"url\":\"https:\/\/www.cacbgi.cat\/wp-content\/uploads\/2025\/11\/Obra_VilanovaMuga.jpg\",\"width\":2000,\"height\":1500},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/#webpage\",\"url\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/\",\"name\":\"El Consorci d\\u2019Aig\\u00fces millora la fiabilitat de les infraestructures de captaci\\u00f3 i transport d\\u2019aigua a la Costa Brava nord - CACBGI\",\"isPartOf\":{\"@id\":\"https:\/\/www.cacbgi.cat\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/#primaryimage\"},\"datePublished\":\"2025-11-26T10:23:32+00:00\",\"dateModified\":\"2025-11-26T10:23:32+00:00\",\"author\":{\"@id\":\"https:\/\/www.cacbgi.cat\/#\/schema\/person\/a6fa16bd957f78f555960bfddebfc8a0\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/\",\"url\":\"https:\/\/www.cacbgi.cat\/\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"position\":2,\"item\":{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/\",\"url\":\"https:\/\/www.cacbgi.cat\/el-consorci-daigues-millora-la-fiabilitat-de-les-infraestructures-de-captacio-i-transport-daigua-a-la-costa-brava-nord\/\",\"name\":\"El Consorci d\\u2019Aig\\u00fces millora la fiabilitat de les infraestructures de captaci\\u00f3 i transport d\\u2019aigua a la Costa Brava nord\"}}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cacbgi.cat\/#\/schema\/person\/a6fa16bd957f78f555960bfddebfc8a0\",\"name\":\"premsa\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.cacbgi.cat\/#personlogo\",\"inLanguage\":\"es\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7e4303e9208064feace10571418cadd2?s=96&d=mm&r=g\",\"caption\":\"premsa\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","_links":{"self":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/8675"}],"collection":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/comments?post=8675"}],"version-history":[{"count":2,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/8675\/revisions"}],"predecessor-version":[{"id":8681,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/posts\/8675\/revisions\/8681"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/media\/8679"}],"wp:attachment":[{"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/media?parent=8675"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/categories?post=8675"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cacbgi.cat\/es\/wp-json\/wp\/v2\/tags?post=8675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}